Repair Engine Shop F187
- Vance AFB, Enid, Oklahoma
- 12/28/2022 – 2/15/2024
This project aimed to improve the sustainability and quality of life for the occupants of F187 by addressing various repairs and upgrades.
Specific Tasks:
- Foundation Repair: Repaired the foundation grade beam at the southwest corner.
- Roof Replacement: Replaced the entire roof, including lean-to areas, gutters, and rain leaders.
- Exterior Wall Repairs: Re-tuck pointed CMU walls, removed flaking paint, and repainted the exterior.
- Drainage Repair: Earthwork regraded along the western wall to create drainage away from the building.
- Rain Guard Repair: Repaired the rain guards along the western wall.
- Window and Door Repairs: Resealed exterior window seals, caulking, door seals, sweeps, and doors.
- Painting: Repainted exterior doors and frames.
- Mezzanine Railing: Provided new mezzanine railings to meet OSHA standards.
- Exit Signs: Updated exit signs to comply with current life safety codes.
- Electrical Panels: Updated the electrical panels with new.
- Lighting Upgrades: Replaced lighting in the shop and offices with LED lights.
These improvements enhanced the building’s structural integrity, energy efficiency, and overall condition.