• Skip to navigation
  • Skip to content

Commercial Builders Since 1973

Navigation

  • Home
  • About
  • Projects
  • Contact

Switch Bank
Bank of Batteries
Bent Conduit
Chillers
Connection to Battery
Entrance
Conduit
Conduits
Conduits
Conduits

Systems Management Facilities Upgrades (SMF)

Major replacement and upgrades of utilities, mechanical and electrical systems.  This complex project included the intricate phasing of additional medium voltage power, two new 1.2 megawatt generators, electrical duct bank, UPS system with battery backup, fire rated walls, UPS ventilation system repair, new sanitary and storm systems, new fire protection system, commissioning of electrical and mechanical systems and Test & Balance of HVAC.  This project consisted of upgrading the mechanical, electrical and plumbing systems for nation-wide FAA payroll and IRS computer system.  There were numerous scheduled shutdowns with the user to tie into existing systems, usually after hours or weekends.  The computer systems remained 100% functional throughout the project, ZERO shutdowns.   

Back to parent gallery

© Copyright 2012 - Terra Construction Inc • 7429 NW 84th Street, Oklahoma City 73132 • All Rights Reserved