• Skip to navigation
  • Skip to content

Commercial Builders Since 1973

Navigation

  • Home
  • About
  • Projects
  • Contact

Back Side
Front
Back view

FAA Security Command Center

Phase I consisted of 1,500 SF limestone panel faced guard station with the new roads created to provide main entry into the FAA campus.                                                                                                 

Phase II consisted of a 10,000 SF new building which is the main security building for FAA.  This building exterior was faced with granite and limestone panels. The highlights of this building are 20% of the building can be used as a storm shelter, backup power generators natural gas and diesel powered, major security and communication systems and a large concrete aesthetic radius colonnade structure skinned with metal panels.  This project is the main entry to the Federal Aviation Administration Campus in Oklahoma City, OK.                                 

Phase III is a project truck access road lanes, parking lot and canopy skinned with metal panels to match Phases I & II.    

Phase IV was project consisting of limestone monument signs with LED Signage, drive canopy at Phase I Guard Station with extensive lawn sprinklers and landscaping. 

 

Back to parent gallery

© Copyright 2012 - Terra Construction Inc • 7429 NW 84th Street, Oklahoma City 73132 • All Rights Reserved