

This project consists of the installation and testing of 7,236 lnft of new 12” water lines for the new design-build water tower. Demolition, installation and testing for 7,716 lnft of new sewer lines by using the pipe bursting method in the existing Ranchwood Subdivision. This project also included the design-build of a new 1,000,000 gallon water tower including a composite tank, cast-in-place concrete round pedestal and foundation.