Government

Falcon Range Demolition & Replacement of Admin Facilities, Tower & Vehicle Canopy

Falcon Range Demolition & Replacement of Admin Facilities, Tower & Vehicle Canopy Falcon Range, Fort Sill, Oklahoma 12/23/2019 – 12/14/2022 Demolition Phase: Demolished the existing Target Ops and Range Administration buildings. Removed concrete foundations and the existing septic system. New Construction: Constructed a new 3,750 square foot pre-engineered metal building. The new building included offices, […]

Falcon Range Demolition & Replacement of Admin Facilities, Tower & Vehicle Canopy Read More »

Renovate Unaccompanied Officer Housing F644

Renovate Unaccompanied Officer Housing F644 Vance AFB, Enid, Oklahoma 12/28/2022 – 05/28/2024 Scope of Work: Selective Demolition: Removed existing interior and exterior construction elements, finishes, and modifications. Renovations: Replaced windows. Addressed mold remediation and asbestos abatement. Replaced and upgraded plumbing, fire alarm, HVAC, and electrical systems. Renovated two units to meet ABA regulatory requirements. Fully

Renovate Unaccompanied Officer Housing F644 Read More »

Renovate Unaccompanied Officer Housing F643

Renovate Unaccompanied Officer Housing F643 Vance AFB, Enid, Oklahoma 12/28/2022 – 05/03/2024 Scope of Work: Selective Demolition: Removed existing interior and exterior construction elements, finishes, and modifications. Renovations: Replaced windows. Addressed mold remediation and asbestos abatement. Replaced and upgraded plumbing, fire alarm, HVAC, and electrical systems. Renovated two units to meet ABA regulatory requirements. Fully

Renovate Unaccompanied Officer Housing F643 Read More »

Repair Engine Shop F187

Repair Engine Shop F187 Vance AFB, Enid, Oklahoma 12/28/2022 – 2/15/2024 This project aimed to improve the sustainability and quality of life for the occupants of F187 by addressing various repairs and upgrades. Specific Tasks: Foundation Repair: Repaired the foundation grade beam at the southwest corner. Roof Replacement: Replaced the entire roof, including lean-to areas,

Repair Engine Shop F187 Read More »

Arizona Prescott National Cemetery

Arizona Prescott National Cemetery Arizona Prescott National Cemetery New Construction and Renovation of 5-acre Committal Shelter & Cemetery 12/22/2013 – 5/18/2015 This project included new construction and renovation of 5-acre Committal Shelter and Cemetery at Prescott National Cemetery, AZ. The 3-phase project also included improvements to cemetery facilities and corrections to infrastructure deficiencies through retrofitting

Arizona Prescott National Cemetery Read More »

Yukon Water Tower

Yukon Water Tower Yukon, OK. Government – City of Yukon Project thru the USACE 9/30/2016 – 12/10/2017 This project consists of the installation and testing of 7,236 lnft of new 12” water lines for the new design-build water tower. Demolition, installation and testing for 7,716 lnft of new sewer lines by using the pipe bursting

Yukon Water Tower Read More »

Systems Management Facility Upgrades

Systems Management Facility Upgrades Mike Monroney Aeronautical Center, Oklahoma City, OK Federal and State – Civil 9/23/2008 – 10/07/2009 This project involved the renovation of an occupied clean room computer facility. The renovation included intricate phasing with building occupant. This was a complex project that included heavy civil, new electrical infrastructure which included replacing the

Systems Management Facility Upgrades Read More »

Design-Build Renovate Radiology

Design-Build Renovate Radiology OKC VA Medical Center Oklahoma City, OK Federal – Occupied VA Hospital Veterans Administration 09/26/2011 – 02/28/2013 Design-build project to demo and renovate 5,350SF area on the 2nd floor of the Oklahoma City, VA Medical Center. Build back included new MRI, CT and Ultrasound rooms as well as offices and patient rooms.

Design-Build Renovate Radiology Read More »

Inpatient Mental Health Support Space

Inpatient Mental Health Support Space Raymond G Murphy VA Medical Center Albuquerque, NM Federal – Occupied VA Hospital Veterans Administration 12/17/2015 – 10/01/2017 This design-bid-build project provided an additional 7,000 square foot new structure on the roof of an occupied hospital. The project site was adjacent to the loading dock and above the hospital ICU.

Inpatient Mental Health Support Space Read More »

Construct Parking Garage

Construct Parking Garage Oklahoma City VA Medical Center Oklahoma City, OK Firm Fixed Price 12/11/2015 – 09/13/2018 Construction of a new precast tee system multi-level parking structure on the SE corner of the Oklahoma City VAMC. The new parking structure encompasses 122,000SF of raised parking and 65,000SF of surface level parking and will provide enough

Construct Parking Garage Read More »

Construct Mental Health Facility

Construct Mental Health Facility Oklahoma City VA Medical Center, OK Firm Fixed Price 01/26/2012 – 06/11/2014 The new Mental Health Facility was a three-story addition built on top of the existing single-story Radiology Oncology Building at the OKC VAMC. The existing Radiology building remained in operation with two linear accelerators operating and treating patients daily,

Construct Mental Health Facility Read More »

Renovate A-Mod for Women’s Clinic

Renovate A-Mod for Women’s Clinic Oklahoma City VA Medical Center Oklahoma City, OK Occupied Medical Facility 9/30/2016 – 3/26/2019 Design-Bid-Build 2 Phase project for the interior renovation of approximately 10,400 sf of vacant and occupied spaces in the OKC VA Medical Center in order to accommodate the existing functions that consist of the Agent Cashier,

Renovate A-Mod for Women’s Clinic Read More »

Renovate 7 East

Renovate 7 East Oklahoma City VA Medical Center Oklahoma City, OK Federal – Occupied VA Hospital/7th Floor 7/10/2019 – 11/4/2020 The renovation of 8,696 square feet of existing space on the 7th floor for use as an inpatient chemotherapy bed unit. The renovation of 7 East into a chemotherapy ward will house 10 patient beds,

Renovate 7 East Read More »

Repair CFI for IDEO Systems

Repair CFI for IDEO Systems San Antonio Military Medical Center Fort Sam Houston, TX Firm Fixed Price MATOC Task Order 09/20/2015 – 04/08/2016 This Design-Build project was constructed in two phases to allow for the continuous prosthetics limb manufacturing during the renovation and was discussed with the end user to ensure that the manufacturing processes

Repair CFI for IDEO Systems Read More »

Scroll to Top